4.10 HP and LP Heater Erection
Applicable scope:applicable to HP and LP heater erection,with the following inspection items:heater inspection,heater erection(refer to Table 4.3.35 ordinary heat exchanger erection).
4.10.1 HP and LP heater inspection and acceptance are given in Table 4.10.1.
Table 4.10.1 HP and LP heater inspection

4.10.2 Mandatory provision implementation inspection of HP heater inspection and erection,LP heater inspection and erection,gland condenser inspection and erection,ST hall drain flash tank erection and other heat exchanger erection subsection projects are given in Table 4.10.2.
Table 4.10.2 Mandatory provision implementation inspection table of( )subsection project

推薦閱讀
- DL/T 5044-2014 電力工程直流電源系統設計技術規程
- GB 50309-2017 工業爐砌筑工程質量驗收標準
- GB 51326-2018 鈦冶煉廠工藝設計標準
- DL/T 5544-2018 架空輸電線路錨桿基礎設計規程
- GB/T 51331-2018 煤焦化焦油加工工程設計標準
- DL/T 5502-2015 串補站初步設計文件內容深度規定
- GB/T 50643-2018 橡膠工廠職業安全衛生設計標準
- GB 51203-2016 高聳結構工程施工質量驗收規范
- GB 51258-2017 玻璃纖維工廠設計標準
- GB50629-2010板帶軋鋼工藝設計規范(英文版)
- 機械基礎地基動力特性測試規程
- 巖土工程勘察圖式圖例規程
- DL/T5233-2010±800kV及以下直流換流站電氣裝置施工質量檢驗及評定規程(英文版)
- GB/T 50312-2016 綜合布線系統工程驗收規范
- DL/T 5493-2014 電力工程基樁檢測技術規程