4.8 Air Cooled Condenser System Erection
4.8.1 Steel structure erection.
Applicable scope:applicable to air-cooled condenser steel structure erection,with the following inspection items:foundation setting out,steel structure pre-assembly,support steel structure erection,support steel structure high-strength bolt erection,fan support structure and platform cover erection,tube bundle supporting A type rack erection,windbreak erection.
1 Foundation setting out inspection and acceptance are given in Table 4.8.1-1.
Table 4.8.1-1 Foundation Setting Out

2 Steel structure pre-assembly inspection and acceptance are given in Table 4.8.1-2.
Table 4.8.1-2 Steel structure pre-assembly

Table 4.8.1-2(Continued)

3 Supporting steel structure erection inspection and acceptance are given in Table 4.8.1-3.
Table 4.8.1-3 Supporting steel structure erection

Table 4.8.1-3(Continued)

4 Supporting steel structure high-strength bolt erection inspection and acceptance are given in Table 4.8.1-4.
Table 4.8.1-4 Supporting steel structure high-strength bolt erection

5 Fan bridge and platform cover plate erection inspection and acceptance are given in Table 4.8.1-5.
Table 4.8.1-5 Fan bridge and platform cover plate erection

6 Tube bundle supporting“A”type framework erection inspection and acceptance are given in Table 4.8.1-6.
Table 4.8.1-6 Tube bundle supporting“A”type framework erection

7 Windbreak erection inspection and acceptance are given in Table 4.8.1-7.
Table 4.8.1-7 Windbreak erection

4.8.2 Air cooled condenser fan erection inspection and acceptance are given in Table 4.8.2.
Table 4.8.2 Air cooled condenser fan erection

Table 4.8.2(Continued)

4.8.3 Condensing tube bundle erection inspection and acceptance are given in Table 4.8.3.
Table 4.8.3 Condensing tube bundle and flushing device erection

4.8.4 Air cooled system leakage test inspection and acceptance is given in Table 4.8.4.
Table 4.8.4 Air cooled system leakage test

4.8.5 Mandatory provision implementation inspection of air cooled condenser system erection subsection project is given in Table 4.8.5.
Table 4.8.5 Mandatory provision implementation inspection table of air cooled condenser system erection subsection project

Table 4.8.5(Continued)

- DL/T5161.10-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第10部分:35kV及以下架空電力線路施工質(zhì)量檢驗(英文版)
- GB 50260-2013 電力設(shè)施抗震設(shè)計規(guī)范(英文版)
- DL/T 5491-2014 電力工程交流不間斷電源系統(tǒng)設(shè)計技術(shù)規(guī)程
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規(guī)范(英文版)
- SH3011-2011石油化工工藝裝置布置設(shè)計規(guī)范(英文版)
- GB 51221-2017 城鎮(zhèn)污水處理廠工程施工規(guī)范
- DL/T5161.3-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第3部分:電力變壓器、油浸電抗器、互感器施工質(zhì)量檢驗(英文版)
- GB/T 50643-2018 橡膠工廠職業(yè)安全衛(wèi)生設(shè)計標(biāo)準(zhǔn)
- DL/T5161.5-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第5部分:電纜線路施工質(zhì)量檢驗(英文版)
- 機械基礎(chǔ)地基動力特性測試規(guī)程
- GB/T 50050-2017 工業(yè)循環(huán)冷卻水處理設(shè)計規(guī)范
- GB 51205-2016 精對苯二甲酸工廠設(shè)計規(guī)范
- 鉆探、井探、槽探操作規(guī)程
- GB/T 51223-2017 公共建筑標(biāo)識系統(tǒng)技術(shù)規(guī)范
- 變電站和換流站給水排水設(shè)計規(guī)程