8 Roller Table
8.1 General Requirement
8.1.1 This chapter is applicable to equipment installation works for centralized driving and single driving roller tables of hot rolling and strip conveying roller table of cold rolling.
8.1.2 Assembly of drive gearbox and coupling for roller table shall meet the requirements of technical documents and current national standard,i.e.,"General code for construction and acceptance of mechanical equipment installation engineering"(GB 50231).
8.1.3 The accuracy classification for roller table shall be in accordance with those specified in Table 8.1.3.
Table 8.1.3 Accuracy classification for roller table

推薦閱讀
- DL/T5161.10-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第10部分:35kV及以下架空電力線路施工質(zhì)量檢驗(yàn)(英文版)
- GB50713-2011板帶精整工藝設(shè)計(jì)規(guī)范(英文版)
- GB 50077-2017 鋼筋混凝土筒倉(cāng)設(shè)計(jì)標(biāo)準(zhǔn)
- 配用電通信技術(shù)及產(chǎn)業(yè)發(fā)展報(bào)告
- GB 51179-2016 煤礦井下煤炭運(yùn)輸設(shè)計(jì)規(guī)范
- GB50542-2009石油化工廠區(qū)管線綜合技術(shù)規(guī)范(英文版)
- GB/T 50770-2013 石油化工安全儀表系統(tǒng)設(shè)計(jì)規(guī)范(英文版)
- GB50148-2010電氣裝置安裝工程電力變壓器、油浸電抗器、互感器施工及驗(yàn)收規(guī)范(英文版)
- GB50060-20083~110kV高壓配電裝置設(shè)計(jì)規(guī)范(英文版)
- 濕陷性土起始?jí)毫y(cè)試規(guī)程
- GB50439-2015煉鋼工程設(shè)計(jì)規(guī)范(英文版)
- GB50217-2007電力工程電纜設(shè)計(jì)規(guī)范(英文版)
- GB 50404-2017 硬泡聚氨酯保溫防水工程技術(shù)規(guī)范
- SH/T 3405-2012 石油化工鋼管尺寸系列(英文版)
- 工程建設(shè)標(biāo)準(zhǔn)體系(農(nóng)業(yè)工程部分)