2 Terms and Symbols
2.1 Terms
2.1.1 Overhead transmission line
An electric line whose conductors are supported above ground,generally by means of insulators and appropriate supports.
2.1.2 Telecommunication line
Various communication lines for electric signals.
2.1.3 Large crossing
Tension sections of lines crossing wide navigable rivers,lakes or straits with large span lengths(above 1000m)or high towers(higher than 100m),where special consideration shall be given to conductor selection or tower design and a fault may severely influence navigation or is extremely difficult to repair.
2.1.4 Light/medium/heavy icing area
A light icing area is an area with design icing thickness of 10mm and below,a medium icing area with 10mm to 20mm,and a heavy icing area with 20mm and above.
2.1.5 Reference wind speed
Wind speed determined by probabilistic method through the mean annual maximum wind speed in 10minutes at 50(30)-year return period at 10m height above flat and open ground.
2.1.6 Rare wind speed,rare ice thickness
Severe winds or icing which did occur according to historical records and significantly exceeded historically recorded frequency curves over the years.
2.1.7 Tension section
Linesection between two strain towers.
2.1.8 Everyday tension
The tension at the lowest point of sag of conductor or earthwirecalculated under annual average temperature.
2.1.9 Equivalent salt deposit density(ESDD)
Amount of sodium chloride(NaCl)that,when dissolved in demineralized water,gives the same volume conductivity as that of the natural deposit removed from a given surface of the insulator divided by the area of this surface,ESDD for short.
2.1.10 Non-soluble deposit density(NSDD)
Amount of non-soluble residue removed from a given surface of the insulator,divided by the area of this surface,NSDD for short.
2.1.11 Weighting foundation
A foundation whose uplift stability mainly depends on its weight which shall be larger than the standard value of uplift force.
2.1.12 Reinforced concrete pole
The general name for common reinforced concrete pole,partial prestressed concrete pole and prestressed reinforced concrete pole.
2.1.13 Residential area
Populated areassuch as industrial area,port,wharf,rail station and towns.
2.1.14 Non-residential area
Areas other than residential areas defined in 2.1.13.
2.1.15 Difficult transport area
Areas inaccessible for vehicles and agricultural machinery.
2.1.16 Electrical clearance
Minimum clearance between any live part of a line and grounding parts.
2.1.17 Clearance to ground
Minimum clearance between any live part of a line and ground under specified conditions.
2.1.18 Shielding angle
The angle between the vertical plane through the earthwire and a plane through the earthwire and the conductor to be protected against lightning strokes.
2.1.19 Mining affected area
Areas affected by mining activities.
- GB 51120-2015 通信局(站)防雷與接地工程驗收規范(英文版)
- GB/T 51183-2016 農業溫室結構荷載規范
- DL/T5161.3-2002電氣裝置安裝工程質量檢驗及評定規程第3部分:電力變壓器、油浸電抗器、互感器施工質量檢驗(英文版)
- GB/T 51238-2018 巖溶地區建筑地基基礎技術標準
- DL/T 5160-2015 電力工程巖土描述技術規程
- GB/T 51025-2016 超大面積混凝土地面無縫施工技術規范
- GB50402-2007燒結機械設備工程安裝驗收規范(英文版)
- DL/T 5505-2015 電力應急通信設計技術規程
- GB 50360-2016 水煤漿工程設計規范
- 鉆探、井探、槽探操作規程
- GB/T 51293-2018 城市軌道交通給水排水系統技術標準
- GB/T 51189-2016 火力發電廠海水淡化工程調試及驗收規范
- VRP11虛擬現實編輯器標準教程
- GB 51194-2016 通信電源設備安裝工程設計規范
- GB 51291-2018 共燒陶瓷混合電路基板廠設計標準