- CRTSⅡ Bi-block Ballastless Track Sleeper Prefabrication and Laying Technology
- LiChangning DaiYu GaoGuang
- 341字
- 2020-06-29 11:38:32
1 Overview for CRTSⅡBi-blockBallastless Track Structure
According to the unified arrangement of China Railway,Zhengzhou-Xi’an passenger dedicated railway adopted CRTSⅡbi-block ballastless track system.This system,based on Germany Zublin ballastless track,is an innovative ballastless track structure by combining with actual Chinese national conditions.The CRTS Ⅱbi-block ballastless track is constructed by means of mechanical vibrating and embedding method(mechanical method),the primary working procedure on site is concrete pouring,the secondary working procedure is that the prefabricated bi-block sleeper is embedded evenly and continuously poured concrete ballast bed by mechanical vibrating method in fixed mound style,which is adaptable to the ballastless track structure of ZPW2000 track circuit,with much higher level of mechanization.Since the fixed mound replaces tooling rail to assemble track panel,the concrete ballast bed can effectively avoid the temperature stress variation of steel rail in solidification,and avoid the concrete crack caused by concrete creep effect.The design & construction philosophy and construction technology is the first one in China.
CRTS Ⅱbi-block ballastless track can also be constructed by steel rail adjusting beam method(track panel method),which refers to rebar binding,sleeper and steel rail laying,track panel assembly,then the track panel will be tightly aligned by applying special steel rail to adjust beam,finally the track bed slab will be poured by concrete.Steel rail adjusting beam is assembled above track panel,and is supported on the pedestal at both sides of track bed slab or on the protective layer.Its gripping apparatus is fixed on the railhead of the tooling rail,and the level and height of the track can be adjusted by adjusting the horizontal threaded rod and vertical threaded rod on the beam.Related technology concerning this aspect will not be introduced in this book,please refer to The Prefabrication and laying Technology for CRTSⅠ Bi-block Ballastless Track Sleeper,also one this series of books.
- 鐵路客運業(yè)務(wù)實作模擬題例及操作技巧
- 中級汽車維修電工(國家職業(yè)資格四級)考評教程
- 汽車發(fā)動機(jī)故障分析詳解(第2版)
- 汽車故障診斷與檢測技術(shù)(第2版)
- 汽車安全駕駛與應(yīng)急處理
- 汽車美容裝飾實戰(zhàn)28天
- 混合動力汽車結(jié)構(gòu)·原理·檢測·維修
- 本田車系維修體驗
- 汽車控制器與執(zhí)行器維修百日通
- 電動汽車電機(jī)系統(tǒng)噪聲測試與評價:基于傳聲器陣列
- 高速鐵路施工技術(shù)(“四電”工程分冊)
- 汽車傳感器原理與檢修
- 慢行與騎行:現(xiàn)代交通新趨勢
- 新能源汽車故障診斷
- 發(fā)動機(jī)原理與拆裝實踐教程:現(xiàn)代工程實踐教學(xué)(第2版)