2 Prefabrication Production of CRTS ⅡTrack Slab

2.1 Basic Structural Requirement for Track Slab Yard

To take the Qihe No.2 track slab yard(Figure 5)as an example,which belongs to the second tender section of civil works for Beijing-Shanghai high speed railway constructed by China Railway First Group Co.,Ltd.,the basic structure of track slab yard includes eight parts,i.e.office and living area,concrete batching plant,rebar processing area,prefabrication production yard,semi-finished product(semi-manufactured slab)storage area,polishing workshop,finished slab storage area and productive function area.The productive function area includes office and living area,laboratory and material transportation corridor,which is not included in the shared land occupation for the slab yard.The track slab yard occupies about 75mu(1mu≈666.67m2).

This track slab yard undertakes the prefabrication production task for total 18050 pieces of CRTS Ⅱtrack slabs,the total length is 59.21 km(double line)within the second tender section DK326+192~DK385+400 of Beijing-Shanghai high speed railway.Based on the already known production task of track slab and the construction period,two long-line pedestal production lines were installed in the prefabrication workshop,28 sets of formworks were installed for each production line,calculated as 25 days/month,then the designed production capacity is about 1360 slabs/month.

主站蜘蛛池模板: 枣强县| 贡嘎县| 仲巴县| 黄浦区| 保德县| 五华县| 靖州| 延寿县| 凌源市| 赤城县| 临沂市| 郸城县| 永胜县| 陆丰市| 邛崃市| 安康市| 平邑县| 襄垣县| 汉沽区| 鄯善县| 大田县| 田林县| 左权县| 贡觉县| 古浪县| 石河子市| 丰台区| 军事| 吉木萨尔县| 库伦旗| 会宁县| 乐至县| 噶尔县| 丰镇市| 溧阳市| 江都市| 儋州市| 睢宁县| 永城市| 辽宁省| 岐山县|