USING A WORK BREAKDOWN STRUCTURE

If the work requirements are complex, you can use a work breakdown structure (WBS) to model the requirement. The WBS can be developed manually or by using commercially available planning software.

To develop a WBS, each of the key activities or tasks to be performed must first be identified. Next, the related subactivities or subtasks within each key activity that are necessary for successful completion should be identified. This breakdown helps ensure that all activities within the technical requirement have been identified and described in the SOW. In most cases, you will not need to structure your WBS beyond the third level to describe your requirement adequately. The WBS also serves as the basis for developing the independent government cost estimate.

Generally, the WBS serves only as an internal planning document. Do not use the WBS in your SOW or anywhere else in the solicitation. Dictating a WBS in the SOW inhibits a contractor’s flexibility in developing its proposal because the contractor will assume that its proposal must conform to your WBS. This may preclude a proposal that sets forth a better way to do the job.

主站蜘蛛池模板: 马尔康县| 株洲县| 西峡县| 措美县| 监利县| 布拖县| 镇平县| 贵溪市| 方正县| 珲春市| 杭锦旗| 尼玛县| 建始县| 尚义县| 南江县| 大余县| 新巴尔虎左旗| 恩平市| 昌黎县| 湖南省| 普格县| 滕州市| 兰考县| 甘泉县| 利川市| 宜君县| 龙岩市| 墨玉县| 醴陵市| 莱西市| 宜宾市| 伊吾县| 鸡泽县| 蓬莱市| 利津县| 建阳市| 当阳市| 临高县| 旬阳县| 桓仁| 吉林省|