GB51105-2015擠壓鋼管工程設備安裝與驗收規范(英文版)
最新章節:
List of Quoted Standards
本書是《擠壓鋼管工程設備安裝與驗收規范》GB51105-2015的英文版,由中華人民共和國住房和城鄉建設部組織編譯。本書共分11章,主要技術內容包括:總則,基本規定,設備基礎、地腳螺栓和墊板,設備及材料進場,管坯準備段設備,穿/擴孔機,擠壓機,擠壓線輔助設備,環形加熱爐,精整線設備,安全及環保。本書適用于擠壓鋼管工程設備安裝及質量驗收。
最新章節
- List of Quoted Standards
- Explanation of Wording in This Code
- Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment
- Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
品牌:中國計劃出版社有限公司
上架時間:2020-09-25 11:10:34
出版社:中國計劃出版社
本書數字版權由中國計劃出版社有限公司提供,并由其授權上海閱文信息技術有限公司制作發行
- List of Quoted Standards 更新時間:2020-09-25 11:19:31
- Explanation of Wording in This Code
- Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment
- Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix A Classification Table of Subproject and Sub-divisional Work for Extrusion Steel Pipe Production Line Engineering Equipment Installation
- 11.2 Environmental Protection
- 11.1 Safety
- 11 Safety and Environmental Protection
- 10.21 Test-run of Finishing Line Equipment
- 10.20 Inspection and Acceptance of Roller-hearth Solution Heat Furnace
- 10.19 Installation of Roller-hearth Solution Heat Furnace
- 10.18 Inspection and Acceptance of Steel Pipe Exterior Surface Polisher
- 10.17 Installation of Steel Pipe Exterior Surface Polisher
- 10.16 Inspection and Acceptance of Eddy Flaw-detecting Device
- 10.15 Installation of Eddy Flaw-detecting Device
- 10.14 Inspection and Acceptance of Ultrasonic Flaw-detecting Device
- 10.13 Installation of Ultrasonic Flaw-detecting Device
- 10.12 Inspection and Acceptance of Measuring and Weighing Marking Device
- 10.11 Installation of Measuring and Weighing Marking Device
- 10.10 Inspection and Acceptance of Tube Rolling Mill
- 10.9 Installation of Tube Rolling Mill
- 10.8 Inspection and Acceptance of Shot Blasting Machine
- 10.7 Installation of Shot Blasting Machine
- 10.6 Inspection and Acceptance of Pipe Cutting Band Sawing Machine
- 10.5 Installation of Pipe Cutting Band Sawing Machine
- 10.4 Inspection and Acceptance of Inclined Roller Straightener
- 10.3 Installation of Inclined Roller Straightener
- 10.2 Inspection and Acceptance of Pressure Straightener
- 10.1 Installation of Pressure Straightener
- 10 Finishing Line Equipment
- 9.15 Test-run of Rotary Heating Furnace
- 9.14 Inspection and Acceptance of Furnace Door and Lifting Units
- 9.13 Installation of Furnace Door and Lifting Units
- 9.12 Inspection and Acceptance of Furnace Shell
- 9.11 Erection of Furnace Shell
- 9.10 Inspection and Acceptance of Trolley
- 9.9 Installation of Trolley
- 9.8 Inspection and Acceptance of Rotating Steel Platform
- 9.7 Erection of Rotating Steel Platform
- 9.6 Inspection and Acceptance of Backup Rollers and Guide Rollers
- 9.5 Installation of Backup Rollers and Guide Rollers
- 9.4 Inspection and Acceptance of Feeding and Tapping Roller Table
- 9.3 Installation of Feeding and Tapping Roller Table
- 9.2 Inspection and Acceptance of Furnace Steel Structure
- 9.1 Installation of Furnace Steel Structure
- 9 Rotary Heating Furnace
- 8.13 Test-run of Auxiliary Equipment of Extrusion Line
- 8.12 Inspection and Acceptance of Chain Type Cooling Bed
- 8.11 Installation of Chain Type Cooling Bed
- 8.10 Inspection and Acceptance of Quenching Tank
- 8.9 Installation of Quenching Tank
- 8.8 Inspection and Acceptance of High-pressure Descaling Unit
- 8.7 Installation of High-pressure Descaling Unit
- 8.6 Inspection and Acceptance of Induction Heating Furnace
- 8.5 Inspection of Induction Heating Furnace
- 8.4 Inspection and Acceptance of Conveying Roller Table
- 8.3 Installation of Conveying Roller Table
- 8.2 Inspection and Acceptance of Charging Unit and Pipe Billet Cleaning Unit
- 8.1 Installation of Charging Unit and Pipe Billet Cleaning Unit
- 8 Auxiliary Equipment of Extrusion Line
- 7.19 Test-run of Extrusion Press
- 7.18 Inspection and Acceptance of Glass Powder Lubrication Table
- 7.17 Installation of Glass Powder Lubrication Table
- 7.16 Inspection and Acceptance of Main Hydraulic Cylinder
- 7.15 Installation of Main Hydraulic Cylinder
- 7.14 Inspection and Acceptance of Manipulator
- 7.13 Installation of Manipulator
- 7.12 Inspection and Acceptance of Extrusion Container
- 7.11 Installation of Container
- 7.10 Inspection and Acceptance of Piercing Beam
- 7.9 Installation of Piercing Beam
- 7.8 Inspection and Acceptance of Extrusion Beam
- 7.7 Installation of Extrusion Beam
- 7.6 Inspection and Acceptance of Pre-tensioned Column
- 7.5 Installation of Pre-tensioned Column
- 7.4 Inspection and Acceptance of Front and Back Beams
- 7.3 Installation of Front and Back Beams
- 7.2 Inspection and Acceptance of Base Board
- 7.1 Installation of Base Board
- 7 Extrusion Press
- 6.13 Test-run of Punching and Expanding Press
- 6.12 Inspection and Acceptance of Glass Powder Lubrication Table
- 6.11 Installation of Glass Powder Lubrication Table
- 6.10 Inspection and Acceptance of Manipulator
- 6.9 Installation of Manipulator
- 6.8 Inspection and Acceptance of Expanding Container
- 6.7 Installation of Container
- 6.6 Inspection and Acceptance of Upsetting Beam/Piercing Beam
- 6.5 Installation of Upsetting Beam/Piercing Beam
- 6.4 Inspection and Acceptance of Machine Frame
- 6.3 Installation of Machine Frame
- 6.2 Inspection and Acceptance of Base
- 6.1 Installation of Base
- 6 Punching and Expanding Press
- 5.11 Test-run of Equipment of Pipe Billet Preparation Section
- 5.10 Inspection and Acceptance of Deep Hole Drilling Machine
- 5.9 Installation of Deep Hole Drilling Machine
- 5.8 Inspection and Acceptance of Center Hole Drilling Machine
- 5.7 Installation of Center Hole Drilling Machine
- 5.6 Inspection and Acceptance of Facing Machine
- 5.5 Installation of Facing Machine
- 5.4 Inspection and Acceptance of Peeler
- 5.3 Installation of Peeler
- 5.2 Inspection and Acceptance of Short/Long Band Sawing Machine
- 5.1 Installation of Short/Long Band Sawing Machine
- 5 Equipment of Pipe Billet Preparation Section
- 4.2 Inspection and Acceptance of Equipment and Materials
- 4.1 General Requirements
- 4 Equipment and Materials Mobilization
- 3.6 Inspection and Acceptance of Base Plates
- 3.5 Erection of Base Plates
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.3 Erection of Anchor Bolts
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.1 Equipment Foundation Construction
- 3 Equipment Foundation,Anchor Bolt and Base Plate
- 2 Basic Requirements
- 1 General Provisions
- Foreword
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- 版權信息
- 封面
- 封面
- 版權信息
- Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
- Foreword
- 1 General Provisions
- 2 Basic Requirements
- 3 Equipment Foundation,Anchor Bolt and Base Plate
- 3.1 Equipment Foundation Construction
- 3.2 Inspection and Acceptance of Equipment Foundation
- 3.3 Erection of Anchor Bolts
- 3.4 Inspection and Acceptance of Anchor Bolts
- 3.5 Erection of Base Plates
- 3.6 Inspection and Acceptance of Base Plates
- 4 Equipment and Materials Mobilization
- 4.1 General Requirements
- 4.2 Inspection and Acceptance of Equipment and Materials
- 5 Equipment of Pipe Billet Preparation Section
- 5.1 Installation of Short/Long Band Sawing Machine
- 5.2 Inspection and Acceptance of Short/Long Band Sawing Machine
- 5.3 Installation of Peeler
- 5.4 Inspection and Acceptance of Peeler
- 5.5 Installation of Facing Machine
- 5.6 Inspection and Acceptance of Facing Machine
- 5.7 Installation of Center Hole Drilling Machine
- 5.8 Inspection and Acceptance of Center Hole Drilling Machine
- 5.9 Installation of Deep Hole Drilling Machine
- 5.10 Inspection and Acceptance of Deep Hole Drilling Machine
- 5.11 Test-run of Equipment of Pipe Billet Preparation Section
- 6 Punching and Expanding Press
- 6.1 Installation of Base
- 6.2 Inspection and Acceptance of Base
- 6.3 Installation of Machine Frame
- 6.4 Inspection and Acceptance of Machine Frame
- 6.5 Installation of Upsetting Beam/Piercing Beam
- 6.6 Inspection and Acceptance of Upsetting Beam/Piercing Beam
- 6.7 Installation of Container
- 6.8 Inspection and Acceptance of Expanding Container
- 6.9 Installation of Manipulator
- 6.10 Inspection and Acceptance of Manipulator
- 6.11 Installation of Glass Powder Lubrication Table
- 6.12 Inspection and Acceptance of Glass Powder Lubrication Table
- 6.13 Test-run of Punching and Expanding Press
- 7 Extrusion Press
- 7.1 Installation of Base Board
- 7.2 Inspection and Acceptance of Base Board
- 7.3 Installation of Front and Back Beams
- 7.4 Inspection and Acceptance of Front and Back Beams
- 7.5 Installation of Pre-tensioned Column
- 7.6 Inspection and Acceptance of Pre-tensioned Column
- 7.7 Installation of Extrusion Beam
- 7.8 Inspection and Acceptance of Extrusion Beam
- 7.9 Installation of Piercing Beam
- 7.10 Inspection and Acceptance of Piercing Beam
- 7.11 Installation of Container
- 7.12 Inspection and Acceptance of Extrusion Container
- 7.13 Installation of Manipulator
- 7.14 Inspection and Acceptance of Manipulator
- 7.15 Installation of Main Hydraulic Cylinder
- 7.16 Inspection and Acceptance of Main Hydraulic Cylinder
- 7.17 Installation of Glass Powder Lubrication Table
- 7.18 Inspection and Acceptance of Glass Powder Lubrication Table
- 7.19 Test-run of Extrusion Press
- 8 Auxiliary Equipment of Extrusion Line
- 8.1 Installation of Charging Unit and Pipe Billet Cleaning Unit
- 8.2 Inspection and Acceptance of Charging Unit and Pipe Billet Cleaning Unit
- 8.3 Installation of Conveying Roller Table
- 8.4 Inspection and Acceptance of Conveying Roller Table
- 8.5 Inspection of Induction Heating Furnace
- 8.6 Inspection and Acceptance of Induction Heating Furnace
- 8.7 Installation of High-pressure Descaling Unit
- 8.8 Inspection and Acceptance of High-pressure Descaling Unit
- 8.9 Installation of Quenching Tank
- 8.10 Inspection and Acceptance of Quenching Tank
- 8.11 Installation of Chain Type Cooling Bed
- 8.12 Inspection and Acceptance of Chain Type Cooling Bed
- 8.13 Test-run of Auxiliary Equipment of Extrusion Line
- 9 Rotary Heating Furnace
- 9.1 Installation of Furnace Steel Structure
- 9.2 Inspection and Acceptance of Furnace Steel Structure
- 9.3 Installation of Feeding and Tapping Roller Table
- 9.4 Inspection and Acceptance of Feeding and Tapping Roller Table
- 9.5 Installation of Backup Rollers and Guide Rollers
- 9.6 Inspection and Acceptance of Backup Rollers and Guide Rollers
- 9.7 Erection of Rotating Steel Platform
- 9.8 Inspection and Acceptance of Rotating Steel Platform
- 9.9 Installation of Trolley
- 9.10 Inspection and Acceptance of Trolley
- 9.11 Erection of Furnace Shell
- 9.12 Inspection and Acceptance of Furnace Shell
- 9.13 Installation of Furnace Door and Lifting Units
- 9.14 Inspection and Acceptance of Furnace Door and Lifting Units
- 9.15 Test-run of Rotary Heating Furnace
- 10 Finishing Line Equipment
- 10.1 Installation of Pressure Straightener
- 10.2 Inspection and Acceptance of Pressure Straightener
- 10.3 Installation of Inclined Roller Straightener
- 10.4 Inspection and Acceptance of Inclined Roller Straightener
- 10.5 Installation of Pipe Cutting Band Sawing Machine
- 10.6 Inspection and Acceptance of Pipe Cutting Band Sawing Machine
- 10.7 Installation of Shot Blasting Machine
- 10.8 Inspection and Acceptance of Shot Blasting Machine
- 10.9 Installation of Tube Rolling Mill
- 10.10 Inspection and Acceptance of Tube Rolling Mill
- 10.11 Installation of Measuring and Weighing Marking Device
- 10.12 Inspection and Acceptance of Measuring and Weighing Marking Device
- 10.13 Installation of Ultrasonic Flaw-detecting Device
- 10.14 Inspection and Acceptance of Ultrasonic Flaw-detecting Device
- 10.15 Installation of Eddy Flaw-detecting Device
- 10.16 Inspection and Acceptance of Eddy Flaw-detecting Device
- 10.17 Installation of Steel Pipe Exterior Surface Polisher
- 10.18 Inspection and Acceptance of Steel Pipe Exterior Surface Polisher
- 10.19 Installation of Roller-hearth Solution Heat Furnace
- 10.20 Inspection and Acceptance of Roller-hearth Solution Heat Furnace
- 10.21 Test-run of Finishing Line Equipment
- 11 Safety and Environmental Protection
- 11.1 Safety
- 11.2 Environmental Protection
- Appendix A Classification Table of Subproject and Sub-divisional Work for Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
- Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment
- Explanation of Wording in This Code
- List of Quoted Standards 更新時間:2020-09-25 11:19:31